The GPU utilisation problem EAF is actually solving
Ask most infrastructure teams whether they need more GPUs, and the honest answer — once you look at utilisation dashboards rather than procurement requests — is usually no. What they have is GPUs assigned to one team's project that sit mostly idle outside a training run, while another team queues for capacity that technically already exists somewhere in the building.
This is a scheduling and governance problem, not a hardware problem, and it's the specific gap EAF's GPU pooling and fractional scheduling are built to close. Accelerators from different teams, vendors and even generations are pooled under one scheduler, so a training job and an inference workload can share the same physical GPUs instead of each team hoarding a dedicated allocation out of self-preservation.
Fractional scheduling matters here specifically because training and inference have different shapes: training wants sustained, large allocations in bursts; inference wants smaller, steadier, latency-sensitive slices. A pool that can hand out both from the same hardware, rather than partitioning GPUs permanently by workload type, is what actually lifts utilisation rather than just centralising the same siloed allocation under one dashboard.
The cost governance layer is where this becomes a budget conversation rather than just an engineering one: automated tracking of who used what, at what time, attributed back to the team or project. That's usually the piece that gets a GPU pooling initiative funded — not the promise of better utilisation in the abstract, but a chargeback model finance can actually act on.